The TEX Report Topics < Iron Ore > Home
HOME >> Topics List >> July, 2009 >> 30 (Thu)
Bulk Shipping Market Flat
= $13.75 / ton set on 160,000-ton W. Australian ore carrier bound for China =
[Capesize]
<W. Australia - China>
- South Korean STX Pan Ocean voyage-chartered the GENCO CONSTANTINE (2008-built) to ship 160,000 tons of iron ore at Dampier, Western Australia for transport to Majishan and Baoshan, China. Freight rate: $13.65/ton. (Fio loading to scale; unloading 30,000 t/d) Laycan schedule: Aug 5 - 10.

- Rio Tinto Shipping voyage-chartered a TBN owned by North China Shipping to ship 160,000 tons of iron ore at Dampier for transport to Qingdao. Freight rate: $13.75/ton. (Fio loading to scale; unloading 30,000 t/d) Laycan schedule: Aug 11 - 20.

- China's Jiangsu Shagang voyage-chartered the CAPE ISLAND (2000-built) to ship 160,000 tons of iron ore at Dampier for transport to Qingdao. Freight rate: $13.50/ton. (Fio loading to scale; unloading 30,000 t/d) Laycan schedule: July 25 - Aug 5. the vessel is relet from Cargill.

<Brazil - China>
- Hong Kong's Noble Chartering voyage-chartered a TBN to ship 160,000 tons of iron ore at Tubarão, Brazil for transport to Qingdao. Freight rate: $37.50/ton. (Fio loading to scale; unloading 30,000 t/d) Laycan schedule: Aug 20 - 29.

<S. Africa - China>
- Kumba Iron Ore voyage-chartered the AZUL GLORY (1998-built) to ship 160,000 tons of iron ore at Saldanha Bay, South Africa for transport to Qingdao. Freight rate: $26.00/ton. (Fio loading to scale; unloading 30,000 t/d) Laycan schedule: Aug 20 - 30.

[Panamax]
<Canada - Germany>
- ArcelorMittal voyage-chartered the MARBELLA (2000-built) to ship 70,000 tons of iron ore at P. Cartier, Canada for transport to Hansaport, Germany. Freight rate: $15.00/ton. (Fio loading 48,000 t/d; unloading 25,000 t/d) Laycan schedule: Aug 1 - 15.
data image
last modified : Tue 04 Aug, 2009 [09:54]
Copyright (C) 2004 The TEX Report Ltd. All Rights Reserved.